Gemasolar

General Info
Owner/s: 
Torresol Energy
Technology: 
Central receiver (power tower)
Country: 
Spain
Status: 
Operational
Purpose: 
Commercial
Usage: 
Electricity
Power: 
20.00 MW
Construction start date: 
February 2009
Start date: 
April, 2011
Location: 
Fuentes de Andalucia, Seville
Generation: 
110.00 GWh
Land area: 
195 hectares
Technology

Solar field

Heliostats: 
SENER
Mirrors / Reflective surface: 
Guardian
Heliostat aperture: 
110 m²
Number of heliostats: 
2650
Reflecting area: 
304 750 m²
Central receiver: 
ITP (Alliance of SENER and Rolls Royce)
Receiver: 
SENER
Heat Transfer Fluid: 
Molten salts - sodium and potassium nitrates
HTF Temp in: 
290ºC
HTF Temp out: 
565ºC
Tower height: 
140 m

Power block

Storage Y/N: 
Yes
Storage type: 
two tank direct - Molten salts
Storage: 
15.00 Hours
Power cycle: 
Steam Rankine
Turbine: 
Siemens SST600
Cooling: 
Wet
Power (gross): 
20.00 MW
Power (net): 
19.90 MW
Backup: 
Yes
Backup type: 
Natural gas for HTF heating - 15% max
Companies involved
Project developer: 
Torresol Energy
EPC: 
Cobra
SENER
O&M: 
Torresol Energy
Key components suppliers: 
Siemens
Foster Wheeler
SENER
Guardian
Suppliers details: 
SENER (Heliostats)
Foster Wheeler (Steam generation)
Guardian (Mirrors)
AKO (Electric heat tracing)
Lazaro Ituarte Valves (Valves)
CCI (Valves)
Flowserve (Control valves)
Ideas en Metal (Metalic structures)
Leser (Safety valves)
Saidi (Valves)
Sindus (Cooling tower)
Smit
TSK
Wika (pressure and temperature measurement)
Imasa (Power block and BOP pipes)
Energia Gigjon (Metal sttructures)
Flexim (Flowmeter for HTF and/or Molten Salt)
Schubert & Salzer - BVALVE (Valves)
Esindus (Cooling towers)
Sulzer (Pumps)
Ensival Moret (Pumps)
BEROA (Tower construction)
Socioeconomics
Cost: 
€244 million
Generation Offtaker: 
Endesa
PPA/Tariff: 
Spain RD661/2007 Feed-in-Tariff - 25 years - 27 eurocent per kWh
Construction Employment: 
800
O&M employment: 
45
Financing: 
European Investment Bank - €110 million
Banco Popular - €16.14 million
Banesto - €16.14 million
ICO - €16.14 million
€73 million equity
Other
Solar resource: 
2 172 kWh/m2/yr
Solar resource source: 
SENER
Other info: 

Gemasolar was born as "Solar Tres" project to develop a central receiver plant that uses molten salts as heat transfer fluid (HTF) and as thermal storage system.

The project was co-founded by the 5th Framework Program of the European Commission with €5 million.

The "Solar Tres" research program was carried out from 2002 to 2008 at the Plataforma Solar de Almeria (PSA), where tests for heliostats and receiver took place. The participants were SENER (leader participant), GHER SA, Ciemat-PSA, Saint Gobain and Siemens.

 

General comments:

The plant became operational in May 2011 and was inaugurated on October 2011, by  HM the King of Spain Juan Carlos I and HH Sheikh Mohamed Bin Zayed.

Documents and links:
AttachmentSize
PDF icon Gemasolar CSP plant fact sheet814.86 KB
Gemasolar concentrated solar power plant - Picture:Torresol Energy Gemasolar concentrated solar power plant - Picture:Torresol Energy Gemasolar concentrated solar power plant - Picture:Torresol Energy Gemasolar concentrated solar power plant - Picture:Torresol Energy Gemasolar concentrated solar power plant - Picture:Torresol Energy